Open issues before we buy
Everything that could stop or reshape the project, ranked by how much it matters. Update status as each one is resolved.
Permit: to be investigated
The site is listed as I-2 industrial. Whether a mini golf course, bar and food truck court can operate here, and through which approval, is not yet known. Treat this as the gating item: nothing else on this list matters if the use is not allowed. Do not waive the zoning contingency.
| # | Issue and next steps | Status | Priority |
|---|---|---|---|
| 1 | Zoning / use permit The broker markets the parcel as I-2 industrial, for warehouse, distribution and outdoor storage users. Mini golf, a bar and food trucks are commercial recreation and assembly uses. These may need a use permit, a special use approval or a rezoning, or may not be allowed at all. The Durham UDO use table has not been pulled yet.
|
To investigate | High |
| 2 | Change of occupancy / building code Going from warehouse (storage) to a place where crowds gather and drink triggers assembly-occupancy rules: fire sprinklers, exits, restrooms, ADA. This is the largest capex unknown; the model carries $150,000 for the building upfit.
|
Open | High |
| 3 | ABC permits (alcohol) NC requires 30% of receipts from food and non-alcoholic drinks to qualify as a restaurant. Food truck sales are the trucks' own, so we likely apply as a bar. Since 2022 bars no longer need membership lists. Fees: mixed beverages $1,000, on-premises malt $400, on-premises wine $400.
|
Open | Medium |
| 4 | Purchase price gap Owner target is $1.8M; the broker brochure asks $2.2M. The extra $400,000 costs about $29,000/yr in interest if financed at 7.25%, or adds $400,000 of equity.
|
Open | Medium |
| 5 | Parking The to-scale plan fits about 27 spaces in the wedge beside the building against a peak need of ~35 cars, and each aisle needs its own curb cut. Zoning may also set a minimum.
|
Open | Medium |
| 6 | Heat and weather (no A/C) The building is not air-conditioned. Summer afternoons are peak family time and the hottest part of the day.
|
Open | Medium |
| 7 | Vandalism and security Outdoor holes, props and furniture sit in the yard overnight. The site already has a fence, but it is industrial chain link.
|
Planned | Medium |
| 8 | Noise and neighbors Late-night bar and outdoor play next to new mixed-use neighbors could draw complaints or permit conditions.
|
Open | Low |
| 9 | Environmental condition The parcel has had industrial and commercial uses since the mid-1900s.
|
Open | Low |
| 10 | Food truck rules Trucks need county health permits and a commissary. A permanent truck court may need its own site approval.
|
Open | Low |
Sources
- 806 E Ramseur sale brochure (I-2 zoning, intended uses) · retrieved Oct 2026
- NC ABC retail permit types · retrieved Oct 2026
- NC G.S. 18B-902 permit fees · current statute
- NC 2022 alcohol law changes (bar permit, no membership), Williams Mullen · 2022